The estimate becomes the budget. Then defends it.
At award, the bid locks into a baseline budget — every cost code, every assembly, every assumed hour. Then Bedrock tracks every commitment, invoice, change order, and forecast against it. Overruns surface in days, not months.
Every estimate line drops into the budget with cost codes intact. Change orders attach to the right line. Original budget, current budget, and forecast all live side by side.
- Auto-generated from the winning estimate at award
- Original budget vs. current budget vs. estimate at completion
- Change orders and contingency draws on the same sheet
- Per-CSI-division or per-phase budget rollups
- Overrun alerts before the month closes